Confirm the machine’s transport dimensions and weight, the receiving address and access, the unloading method, responsible parties and the documents needed at handover. A quotation is not a delivery booking until arrangements are confirmed.
Describe the receiving site
Provide the full address, site contact, access limitations and permitted receiving window. Identify restrictions that the carrier or site team must evaluate. Do not assume that a postal address establishes a suitable unloading point.
Match transport to the actual configuration
Confirm dimensions and weight with the fitted mast, cab and attachments. Ask the transport provider what information and preparation it requires. Keep equipment changes synchronized with the transport plan.
Agree the handover evidence
Record the expected condition, included accessories, serial number and documents. Set out how discrepancies or damage will be reported and who receives the evidence. A dated checklist can help keep the discussion specific.
Separate delivery from operational readiness
Receiving the machine does not authorize its use. The responsible employer must address inspection, workplace suitability, operator competence and applicable requirements before operation.
Buying information only. Manufacturer documentation and qualified assessment govern equipment and workplace suitability.
Put this into your buying brief
Use the comparison and brief builder to record the known requirements and leave uncertain details for review. You can copy the brief without submitting contact details.
Published by Construction Forklifts. Editorial content is a purchasing aid, not equipment certification, professional inspection or an operating instruction.